Community Corner

New Road Work Scheduled on Suwanee Dam Road, Ga. 20

Check out our interactive map above to find where, when and why local roads will be closed for construction, from the Gwinnett DOT. (Updated weekly)

The weekly road closures report from the Gwinnett Department of Transportation (June 8-14):

Added this week:

Buford

Find out what's happening in Gwinnettwith free, real-time updates from Patch.

  • SR20 from Peachtree Industrial Boulevard to the Chattahoochee River will require intermittent lane closures Sunday, June 9, from 6 a.m. to 10 a.m. in order to perform survey work, weather permitting.
  • SR20 from Peachtree Industrial Boulevard to the Chattahoochee River will require intermittent lane closures and traffic shifts through June 2016 for roadway widening and reconstruction, weather permitting. Any such closures will be between the hours of 9 a.m. to 4 p.m., and 7 p.m. to 6 a.m.

Suwanee

  • Suwanee Dam Road at North Gwinnett High School will require intermittent lane closures through July for queuing lane installation, weather permitting. Any such closures will be between the hours of 9 a.m. and 4 p.m.
  • Suwanee Dam Road from Peachtree Industrial Boulevard to Buford Highway will require intermittent lane closures through July for multi-use path installation and roadway improvements, weather permitting. Any such closures will be between the hours of 9 a.m. and 4 p.m.

Removed from the report:

Find out what's happening in Gwinnettwith free, real-time updates from Patch.

Suwanee: Work on Richland Parkway from Taylor Road and Lawrenceville Suwanee Road for emergency drainage repairs has been completed.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here